Pedestrian Bridge over Nash Street - closed
 Login/Join
 
posted
The pedestrian bridge over Nash Street is closed for repairs as of 7/10/2007.
 
Posts: 14 | Registered: December 10, 2006Reply With QuoteReport This Post
posted Hide Post
Here's an update from Monday Properties on the pedestrian bridge repair that connects the metro Sky Walk to the 1400 Key Blvd Building.

***********************************************

Our new estimated completion date is August 17th.

The scope of work consist of the following:
Remove existing exterior stair 2 days
New stair fabrication 10 days
Install new pedestrian exterior stair 3 days
Pour concrete infill 1 day
Paint stair 2 days

Please note, we closed the pedestrian stairway prior to receiving our
required permit with Arlington County due to safety concerns.

Thanks!

Anita Fox Johnson
Senior Property Manager

Monday Properties
1000 Wilson Boulevard
Suite 700
Arlington, VA 22209
tel: 703-284-0200
fax: 703-525-4439
AJohnson@mondayre.com
 
Posts: 417 | Registered: November 26, 2002Reply With QuoteReport This Post
posted Hide Post
Monday Properties, the owner and manager of the building at 1400 Key Blvd, had some delays with their contractor on the replacement of the stairs from the plaza level of the building to the SkyWalk which leads to the metro. The projected completion date of August 17 did not happen. Crews were setting a new set of stairs in place this morning. If all goes well, this safe pedestrian route from Key Blvd to the metro should reopen within days.

While waiting for the stairs to reopen you can cut through the building's main level from the SkyWalk to Key Blvd between the hours of 8 am and 6 pm. If you are coming from the metro, just enter the door at the end of the SkyWalk next to the stairs that are under repair. This hallway leads you to the lobby and out the front door onto Key Blvd.
 
Posts: 417 | Registered: November 26, 2002Reply With QuoteReport This Post
posted Hide Post
We have been notified by Monday Properties that repairs to the stairway that connect the 1400 Key Blvd building plaza level to the sky walk leading to the metro have been completed. The stairs are new and much nicer and safer than the original setup.

We now have a pedestrian-safe walkway from Oak and Key to the metro and beyond that bypasses the traffic, especially the Ft. Meyer drive high speed raceway.

Monday Properties extends a thank you to the local citizens for their patience during this repair period.

This message has been edited. Last edited by: Paul Derby,
 
Posts: 417 | Registered: November 26, 2002Reply With QuoteReport This Post