Metro Inspection Report of June 29, 2012
 Login/Join 
posted
Both stations were inspected on June 29, 2012. All maintenance departments have been made aware of the inspection findings.

Open Issues: Rosslyn:

Mezzanine Level:
Kiosk clock in inoperable – COMPLETED
Farecard vendor #30 is inoperable - COMPLETED
LED Screen blank – Unresolved
Concrete under escalator #9 is cracked and falling - Unresolved
New Issues:
None

Lower Level Platform:
1 – Ceiling light out (currently two are out) COMPLETED
New Issues:
None

Upper Level Platform:
Escalator #4 – Re-lamp side panel - COMPLETED
Escalator #8 – Repair side panel - COMPLETED
1 – Track bed light out – Unresolved (Currently six lights are out)
1 – Ceiling light out – Unresolved
Escalator #5 restorative work being performed - Unresolved
New Issues:
None

Open Issues: Arlington Cemetery:
Escalator #8 won’t restart - COMPLETED
ADA Gate lock mechanism inoperative – COMPLETED
Faregate #11 – Cards getting stuck - Unresolved
New Issues:
None

Sincerely,

Paul Bumbry
Superintendent, Station Operations
Office of Rail Transportation
Washington Metropolitan Area Transit Authority
4300 Garden City Drive
Hyattsville, MD 20785
Office: 301-955-5216
"Safety is our number one priority"
 
Posts: 417 | Registered: November 26, 2002Reply With QuoteReport This Post
  Powered by Social Strata  
 


© 2002-2020 North Rosslyn Civic Association. All rights reserved.