Go | New | Find | Notify | Tools | Reply |
Both stations were inspected on September 21, 2011. All maintenance departments have been made aware of the inspection findings. Open Issues: Rosslyn: Mezzanine Level: 1 – Light out above artwork – (Currently two out) COMPLETED 1 – Ceiling light out in mezzanine area – (Current 5 lights are out) COMPLETED Escalator # 4 – 2 lights out against wall – (Currently 6 lights are out) COMPLETED Bird spike netting needed on mall side entrance – COMPLETED Vendors 31 & 34 – No bills condition - COMPLETED Video Display in kiosk inoperative – Unresolved LED Screen blank – Unresolved Concrete under escalator #9 is cracked and falling - Unresolved Kiosk clock in inoperable – Unresolved Escalator # 1 – 2 lights out against wall – Unresolved (Currently 4 lights are out) New Issues: None Lower Level Platform: 1 – Ceiling light out (currently two are out) Unresolved 1 – Granite Edge light out – Unresolved New Issues: None Upper Level Platform: 3 – Ceiling lights out - COMPLETED 1 – Track bed light out – Unresolved (Currently six lights are out) Elevator # 1 Tripping hazard - Unresolved New Issues: 1 – Ceiling light out Open Issues: Arlington Cemetery: Escalator #5 – New handrail needed - COMPLETED Loose platform tiles noted – Unresolved New Issues: PIDS Track #1 not working on one side Sincerely, Paul Bumbry Superintendent, Station Operations Office of Rail Transportation Washington Metropolitan Area Transit Authority 4300 Garden City Drive Hyattsville, MD 20785 Office: 202-962-6335 "Safety is our number one priority" | |||
|
Powered by Social Strata |
Please Wait. Your request is being processed... |