Go
New
Find
Notify
Tools
Reply
  
Metro inspection report of May 23, 2006
 Login/Join 
posted
Mr. Derby,

Both locations were inspected on May 23, 2006.

Open Issues: Rosslyn

Elevator leakage - I spoke with our Civil Engineering Department and
was informed they are working with our maintenance department and are
close to a resolution. No new updates.

Two lights out (Up escalator) Reported to Power. Work
completed.

One Mezzanine light out. (Close to kiosk) Reported to Power 5/3/06

New Issues:
Two lower level track bed lights are out - Reported to Power division
5/25/06.

Two granite edge lights out on upper level - Reported 5/25/06.

One lower level ceiling light out - Reported 5/25/06

Two intercoms inoperable - (kiosk passenger & upper level elevator).
Both reported.

Open Issues: Arlington

Six globes are still missing. I have been informed that the globes are
in stock, however, the fixture to hold these globes in place is still
being worked on. No new updates.

Trash on platform accumulating behind concrete siding - Reported to
Station maintenance 5/25/06.


It was good to speak with you this week and I will address the lower
level signage issue we discussed. My next inspection is scheduled for June 13, 2006.

Sincerely,


Paul Bumbry
Blue-Orange Line Customer Service Manager
 
Posts: 417 | Registered: November 26, 2002Reply With QuoteReport This Post
  Powered by Social Strata  
 


© 2002-2020 North Rosslyn Civic Association. All rights reserved.