NRCA Collaboration Area
Metro Inspection Report of Dec 30, 2011

This topic can be found at:
https://community.northrosslyn.org/eve/forums/a/tpc/f/6856007081/m/93920155863

January 04, 2012, 05:25 PM
Paul Derby
Metro Inspection Report of Dec 30, 2011
Both stations were inspected on December 30, 2011. All maintenance departments have been made aware of the inspection findings.

Open Issues: Rosslyn:

Mezzanine Level:
LED Screen blank – Unresolved
Concrete under escalator #9 is cracked and falling - Unresolved
Kiosk clock in inoperable – Unresolved
Escalator # 1 – 2 lights out against wall – Unresolved (Currently 4 lights are out)
New Issues:
Escalator #3 – out of service

Lower Level Platform:
1 – Ceiling light out (currently two are out) Unresolved
1 – Granite Edge light out – Unresolved
5 – Track bed lights out
New Issues:
None

Upper Level Platform:
1 – Track bed light out – Unresolved (Currently six lights are out)
1 – Ceiling light out - Unresolved
New Issues:
None

Open Issues: Arlington Cemetery:
Loose platform tiles noted – Unresolved
PIDS Track #1 not working on one side – Unresolved
CCTV (elevator #2) no picture – Unresolved
Escalators #6 & #5 restorative work being performed
New Issues:
Restroom – Water leak
ADA Faregate – Out of service
Elevator #2 – Interior light is out

Sincerely,

Paul Bumbry
Superintendent, Station Operations
Office of Rail Transportation
Washington Metropolitan Area Transit Authority
4300 Garden City Drive
Hyattsville, MD 20785
Office: 301-955-5216
"Safety is our number one priority"