Open Issues: Rosslyn:

Mezzanine Level:
Video Display in kiosk inoperative – Unresolved
LED Screen blank – Unresolved
Concrete under escalator #9 is cracked and falling - Unresolved
Kiosk clock in inoperable – Unresolved
Escalator # 1 – 2 lights out against wall – Unresolved (Currently 4 lights are out)
New Issues:
None

Lower Level Platform:
1 – Ceiling light out (currently two are out) Unresolved
1 – Granite Edge light out – Unresolved
New Issues:
5 – Track bed lights out
Escalator # 5 is inoperable

Upper Level Platform:
1 – Track bed light out – Unresolved (Currently six lights are out)
Elevator # 1 Tripping hazard – Unresolved
1 – Ceiling light out - Unresolved
New Issues:
None

Open Issues: Arlington Cemetery:
Loose platform tiles noted – Unresolved
PIDS Track #1 not working on one side - Unresolved
New Issues:
CCTV (elevator #2) no picture

Sincerely,


Paul Bumbry
Superintendent, Station Operations
Office of Rail Transportation
Washington Metropolitan Area Transit Authority
4300 Garden City Drive
Hyattsville, MD 20785
Office: 202-962-6335
"Safety is our number one priority"