Both Rosslyn and Arlington Cemetery were inspected yesterday.

Open Issues: Rosslyn

Bike Rack contained five bicycles ( 1 was tagged ) - Completed (tagged
bike has been removed)

Elevator shaft glass shattered - Completed ( panel was replaced.)

Elevator shaft glass dirty - Unresolved ( Addressed with Line
Director)

Lower Level
Platform:

One Granite Edge light out - Unresolved

Three Track Bed lights out - Unresolved

Escalator down

Escalator (Walker) glass cracked

(Escalator issues have been reported to ELES)

(All lighting issues have been reported to Power Division)


Upper Level Platform:

Five Track Bed lights out.- Unresolved -As of 2/22 a total of nine
lights are out. - Completed

One Cooling Tower (pylon) light out

Five Granite Edge lights out

Map Case dirty

Two track Bed lights out

One escalator light out on "UP" escalator

(Map case reported to Station Cleaning Division)


Mezzanine:

One Ceiling light out ( near kiosk) - Completed


Open Issues: Arlington

Seven globes missing - Unresolved ( Discussed with lighting mgr & Line
Director)

Sincerely,
Paul Bumbry
Blue-Orange Line Customer Service Manager
Case # 737603