March 01, 2011, 12:49 PM
Paul DerbyMetro Inspection Report of Feb 11, 2011
Both stations were inspected on February 11, 2011. All maintenance departments have been made aware of the inspection findings.
Open Issues: Rosslyn:
Mezzanine Level:
LED Screen blank – Unresolved
Concrete under escalator #9 is cracked and falling - Unresolved
Video Display in kiosk inoperative – Unresolved (part remains on back order)
1 – Light out above artwork – Unresolved (Currently two out)
1 – Ceiling light out in mezzanine area – Unresolved (Current 5 lights are out)
Kiosk clock in inoperable – Unresolved
1 – Light out over escalator # 10 – Unresolved
Escalator # 1 – 2 lights out against wall – Unresolved (Currently 4 lights are out)
Escalator # 4 – 2 lights out against wall – Unresolved (Currently 6 lights are out)
New Issues:
None
Lower Level Platform:
6 – Trackbed lights out – (Currently 8 lights are out) - COMPLETED
1 – Ceiling light out (close to Escalator #6) Unresolved
1 – Granite Edge light out – Unresolved
New Issues:
None
Upper Level Platform:
2 – Track bed lights out – (Currently 6 lights are out) – Unresolved
3 – Ceiling lights out - Unresolved
New Issues:
Open Issues: Arlington Cemetery:
Loose platform tiles noted – Unresolved
8 – Globe lights out - Unresolved
6 – Lights out in mezz. Area - Unresolved
New Issues:
Sincerely,
Paul Bumbry
Superintendent, Station Operations
Office of Rail Transportation
Washington Metropolitan Area Transit Authority
4300 Garden City Drive
Hyattsville, MD 20785
Office: 202-962-6335
"Safety is our number one priority"