Metro Inspection Report of Jan 9, 2009

This topic can be found at:
https://community.northrosslyn.org/eve/forums/a/tpc/f/6856007081/m/63810549

January 16, 2009, 09:08 PM
Paul Derby
Metro Inspection Report of Jan 9, 2009
The Rosslyn and Arlington Cemetery stations were inspected on 1/09/09 and all
associated metro departments have been notified.

Open Issues: Rosslyn:

Mezzanine Level:
7 overhead lights out (above escalator to Plaza) - Unresolved (No
estimated time for repair due to special equipment required.)
2 Lights out above artwork - Unresolved (Light fixture out of stock.)
Spikes needed over fare gates & PID’s to deter pigeon droppings. -
Unresolved
New Issues:
None

Lower Level Platform:
9 Granite Edge light out - Unresolved
2 Track Bed lights out - Unresolved - Currently 12 lights are out
2 Ceiling lights out - Unresolved
New Issues:
None

Upper Level Platform:
2 Granite Edge lights out - Unresolved
3 Track bed lights out - Unresolved
1 Lobby ceiling light out (In front of elevator #3) - Unresolved
New Issues:
None

Open Issues: Arlington Cemetery
Verizon pay telephone inoperable - COMPLETED
9 Granite Edge lights out - Unresolved
Cob webs on lights in front of kiosk - Unresolved
All granite edge lights do not flash upon train approach - Major
replacement of conduit, piping, etc. underway.
New Issues:
Two globes missing.

Sincerely,
Paul Bumbry
RTRA Customer Service Manager
Case # 737603