Both stations were inspected Feb 27, 2009, and all associated departments have been notified. I apologize that the February report is late. We have had some changes within our department, but will be back on schedule in March.

Open Issues: Rosslyn:

Mezzanine Level:
Spikes needed over fare gates & PID’s to deter pigeon droppings. - COMPLETED
7 overhead lights out (above escalator to Plaza) - Unresolved (No estimated time for repair due to special equipment required.)
2 Lights out above artwork - Unresolved (Light fixture out of stock.)

New Issues:
None

Lower Level Platform:
9 Granite Edge light out - Unresolved
2 Track Bed lights out - Unresolved - Currently 12 lights are out
2 Ceiling lights out - Unresolved

New Issues:
None

Upper Level Platform:
2 Granite Edge lights out - Unresolved
3 Track bed lights out - Unresolved
1 Lobby ceiling light out (In front of elevator #3) - Unresolved

New Issues:
Platform elevator shaft glass panel cracked

Open Issues: Arlington Cemetery:
Cobb webb on lights in front of kiosk - Unresolved
Granite edge lights do not flash - Major repair underway. - Unresolved
Two globes missing - Unresolved

New Issues:
PID’s blank (towards VA)